The EcoGlow Group 01932 550828 Book a free survey
A retrofit assessor recording the outside of a house on a tablet
  1. Home
  2. Surveys & Testing
  3. Retrofit assessment (PAS 2035)

The survey funded work starts with.

A whole-house assessment to PAS 2035, across Chertsey and Surrey. What every funded scheme requires before a single measure goes in.

PAS 2035 certifiedWe hold it, rather than buying the certified part in.
Whole house, not one measureConstruction, moisture, heat loss, ventilation and how you live in it.
What the funding is conditional onWarm Homes: Local Grant and ECO4 both require it.

What it is, and why it exists

PAS 2035 was written because retrofit done measure by measure was causing damage. It is a process, and the assessment is the first part of it.

An assessor photographing the outside of a house on a tablet
  1. The house is assessed as one thing

    Construction, condition, moisture, ventilation, heat loss and occupancy. Not one measure at a time.

  2. Moisture risk is assessed properly

    Most retrofit failures are moisture failures. Insulating a wall changes where moisture in that wall can go, and that has to be understood first.

  3. Then measures are designed, in order

    A written plan: what, in what sequence, and how ventilation keeps up. You can then do it in stages without undoing anything.

  4. And it is evaluated afterwards

    Checks against the design once the work is done, which is the part that makes the standard mean something.

What the assessment covers

Construction and condition
Walls, roof, floors and openings. What they are made of, what state they are in, and what that allows.
Moisture and ventilation
Existing moisture, current ventilation provision, and the risk each proposed measure would introduce.
Heat loss and energy use
Room by room where it matters, and how the house is actually heated and occupied.
Occupancy
How many people, how the house is used, and what that means for moisture and for the measures that suit it.

How it runs

Booking

A date

Longer than an EPC visit — this is a proper survey.

On site

Two to four hours

Every elevation, the loft, the services, and moisture readings where they are warranted.

Afterwards

The assessment report

Written up as the evidence base the design then rests on.

Then

The design

Measures, sequence and specification, with the ventilation strategy alongside.

After the work

Evaluation

Checked against the design, which is what closes the loop and what a scheme requires.

After the report lands

A survey is only useful if somebody acts on it.

The report, in writing

Findings, readings and recommendations, in a document you keep and can show to anybody else.

We will tell you what not to do

Reports generate long lists. We will say which items are worth acting on and which are software defaults or belt and braces.

Work we then do is guaranteed

Two years on our workmanship, in writing, transferable and insurance-backed.

Questions after the report

The surveyor and the installer are the same company.

The questions we get asked most

Is this the same as an EPC?

No, and it is much deeper. An EPC is a standard assessment for a certificate. A PAS 2035 assessment looks at construction, moisture, ventilation and occupancy to design a retrofit that will not cause damage.

Do I need one?

For funded work, yes — it is what the funding is conditional on. For private work it is optional, and it is still the right thing before solid wall insulation.

How long does a retrofit assessment take?

Two to four hours at the property, and the report follows.

Do you do the assessment and the work?

Yes. We hold PAS 2035 and PAS 2030, so the certified parts are not subcontracted.

What does it cost?

It depends on the property and on whether it forms part of a funded package, where it is often covered. We will tell you before you commit.

What if it says a measure is not suitable?

Then that measure does not go in, and the design says why. That is the point of assessing before installing.

Accredited and certified
MCS certified
MCS certified
TrustMark
TrustMark
PAS 2030
PAS 2030
NAPIT
NAPIT
RECC
RECC
Gas Safe
Gas Safe
FENSA
FENSA
F-Gas, Refcom
F-Gas, Refcom
QualityMark Protection
QualityMark Protection
SafeContractor
SafeContractor
Elmhurst Energy
Elmhurst Energy
BPEC
BPEC
CITB
CITB
Constructionline Gold
Constructionline Gold
UK ASL
UK ASL
NICEIC
NICEIC
Which? Trusted Trader
Which? Trusted Trader
OFTEC
OFTEC
INCA
INCA
TrustMark licence 3288118MCS NAP/68787/26/8RECC 00072217Gas Safe 603349F-Gas REF1025855Standards PAS 2035 · PAS 2030
Get a quote

Book a PAS 2035 assessment

Tell us about the property. We will confirm the price, and whether it forms part of a funded package where it is often covered.

  • A fixed price, confirmed before we book
  • Two to four hours at the property
  • Often covered in full within a funded package
  • Weekdays 8am to 5pm, on 01932 550828

How we handle your information.

Or call 01932 550828, Monday to Friday, 8am to 5pm.

Book the assessment first.

It is the part that decides everything after it, and on funded work it is required. We will tell you what it costs before you commit.